May 2011

Did you know?

To illustrate the scope of the Ottawa Convention Centre (OCC) project, here are some interesting statistics on the volume of equipment and labour involved with the AV and technology-related systems installation.

• 38 touch panels
• 8 Crestron control system processors
• 176 audio inputs
• 112 speaker zones
• 26,000 watts of audio amplifiers
• 100,000+ lumens of permanently installed projectors
• 1,200 wired network drops
• 100KM+ of network, fibre, and speaker cabling
• 120 wireless access points
• 11 network rooms
• 300GB+ RAM across 7 HP servers
• 40MB internet bandwidth burstable to 150MB+ as required
• 10,000 hours of project management
• 54 digital signage displays
• 0 worksite injuries